Deployable Fitness Infrastructure · Ontario, Canada
High quality fitness can exist anywhere







Four-season training facilities built inside shipping containers. Engineered in Ontario, craned onto your pad, training the same day. No capital project. No permit queue. Nothing permanent.
- Lead Time
- 6–8weeks
- Siting
- 1day
- Rated to
- −30°C
- Built in
- ONCanada
The Actual Problem
It isn’t a fitness problem. It’s a cost problem.
A gym is a luxury right up until the moment it isn’t. Officers posted to a remote detachment get sent to live in another community. Crews rotate through camps with nothing to do between shifts. Schools bus athletes across town, every week, every season.
Those are line items, and they recur. The alternative — building something permanent — is a six-figure capital project, a permit cycle, and a building you can never move again.
A Lift Locker sites in a day, moves when you move, and lands on your books as an asset rather than a leasehold improvement.
The Range
Two builds.
Fixed specifications.
Standardised units, not custom construction. That’s what makes the price predictable and the lead time honest.
20 ft · High Cube · Four Season
LL-20
The Standard Deployment
A complete four-season training facility in 160 square feet. Sites on a gravel pad, plugs into a 50-amp service, and works at minus thirty.
- Floor
- 160 sq ft
- Capacity
- 1–4 at a time
- Service
- 50A / 240V
40 ft · High Cube · Four Season
LL-40
The One Most Sites Should Buy
Twice the floor, near-identical logistics. Getting a 40 to site costs about what a 20 costs — so unless the pad is tight, this is the better unit.
- Floor
- 320 sq ft
- Capacity
- 4–8 at a time
- Service
- 50A / 240V
Who Buys These
Built for institutions
Eight sectors, one shared problem: a workforce spread across places infrastructure hasn’t reached.
Defence & Policing
Canadian Armed Forces · RCMP · OPP detachments · corrections · remote fire halls
See the Sector 02Remote Worksites & Camps
Mining · forestry · exploration camps · pipeline · remote fabrication
See the Sector 03Energy & Utilities
Nuclear and hydro generation · transmission · wind and solar O&M · LNG
See the Sector 04Heavy Civil & Infrastructure
Highway and bridge builds · tunnelling · general contractors · P3 consortia
See the Sector 05Rail & Transit
Class 1 railways · transit expansion · yards and maintenance centres · signals crews
See the Sector 06Construction & Homebuilding
Homebuilders · high-rise GCs · mechanical and electrical trades · developer sites
See the Sector 07Education & Athletics
Secondary schools · school boards · post-secondary · private athletic academies
See the Sector 08Multi-Residential & Amenity
Condo boards · property managers · developers · student and staff housing
See the SectorHow It Works
Spec to site
in 6–8 weeks
We publish the timeline because almost nobody in this category will.
- 01
Specify
Pick the shell and the equipment package. Fixed configurations, so the price and the lead time are known before we talk.
- 02
Quote
A written quote against a published spec. Delivery and site preparation are quoted separately and honestly, because they depend on your access.
- 03
Build
Fabricated in Ontario to engineer-stamped drawings. ESA inspection before it leaves the shop. Six to eight weeks.
- 04
Deliver
Craned onto your pad. Connected, commissioned and handed over. Training the same day.
Compliance
Stamped.
Inspected.
Insurable.
-
Engineer-Stamped Drawings
Every unit ships with structural drawings stamped to the Ontario Building Code.
-
ESA Inspected
Electrical inspected and certified before the unit leaves the shop.
-
Fire and Life Safety
Smoke and CO detection, extinguisher, egress hardware to code.
-
Structural Certification
CSC-plated shell, reinforced frame, rated lifting points and tie-downs.
Tell us the site.
Twenty minutes. Bring the location, the headcount and the power available — you’ll leave knowing whether this works and roughly what it costs.
Book a Call